Engineered sizing model for Sequential Batch Reactor (SBR) Sewage Treatment Plants. Calculates total daily BOD/COD/TSS mass loads, SBR basin active volumes based on batch cycle fill/react/settle/decant/idle phases and decant drawdown ratio, MLSS mass inventory, F/M loading ratio, actual and standard oxygen demand (AOR/SOR), and diffused aeration blower CFM requirements.
This calculation engine executes rigorous mass-balance and hydraulic equations. Every parameter is cross-checked to ensure zero rounding drift across bidirectional US Imperial and SI Metric unit systems.
2. Governing Standards & Authoritative Citations
"Design calculations for municipal and industrial water infrastructure must strictly adhere to recognized empirical standards to ensure hydraulic stability, structural integrity, and environmental compliance."
— CPHEEO Manual on Sewerage & Sewage Treatment / Metcalf & Eddy Wastewater Engineering, American Water Works Association (AWWA) & U.S. Environmental Protection Agency (EPA Manual 832-B-99-002)
Primary benchmark citations include Crane Technical Paper No. 410, ASME Section VIII, and Metcalf & Eddy Wastewater Engineering.
3. Required Input Parameters & Variables
Symbol: Q
Domestic Sewage Flow Rate
Default: 100 (GPD)
Symbol: LPCD
Per Capita Water Consumption
Default: 135 (GPCD)
Symbol: BOD_in
Raw Sewage BOD5
Default: 300 (mg/L)
Symbol: COD_in
Raw Sewage COD
Default: 500 (mg/L)
Symbol: TSS_in
Raw Sewage TSS
Default: 250 (mg/L)
Symbol: BOD_out
Target Effluent BOD5
Default: 10 (mg/L)
Symbol: TN_in
Raw Sewage Total Nitrogen
Default: 45 (mg/L)
Symbol: TN_out
Target Effluent Total Nitrogen
Default: 10 (mg/L)
Symbol: N_b
Number of SBR Basins
Default: 2 (basins)
Symbol: T_cycle
Batch Cycle Duration
Default: 6 (hr/cycle)
Symbol: t_react
React Aeration Phase HRT
Default: 2.5 (hr)
Symbol: f_decant
Decant Volume Ratio
Default: 25 (%)
Symbol: MLSS
Design MLSS Concentration
Default: 4000 (mg/L)
Symbol: SRT
Sludge Retention Time (SRT)
Default: 15 (days)
Symbol: SOTE
Standard Oxygen Transfer Efficiency
Default: 15 (%)
4. Professional Engineer (PE) Submittal Workflow
WaterCalcStudio Pro generates timestamped PDF calculation reports complete with formula proofs, intermediate variable breakdowns, and signature review blocks suitable for regulatory submittals.